Secured Trading Service

Scaffolding Jack Fixed Swivel Adjustable Galvanized Shoring Post Solid Steel Base Jack with Swivel Base Plate

Weifang Jufeng Metal Products Co., Ltd.
  • Audited Supplier
  • 13 yrs

Contact Supplier

Still deciding? Get samples of $ !
Request Sample

Product Highlights

  • Customizable Dimensions: Diameter and size available as per your specific request.
  • OEM Service Available: We provide full OEM services including custom base plates and private labeling.
  • Hot-Dip Galvanized: Standard surface treatment for superior corrosion resistance and durability.
  • High Loading Capacity: Designed with high-strength steel and rolled spindle threads for heavy-duty support.
  • ISO 9001 Certified: Manufactured under strict quality control with ISO 9001 and SGS certification.
  • Versatile Application: Suitable for building construction, shipbuilding, offshore construction, and industrial maintenance.
  • Adjustable Length: Adjustable range from 100mm to 1000mm to ensure level scaffolding systems.
  • Sample Availability: Samples are available for testing and quality verification before bulk orders.

Shipping

Shipping Cost:
Contact the supplier about freight and estimated delivery time.

Online Trading Protection

Payment Guarantee
T/T PayPal ApplePay GooglePay visa mastercard american express discover JCB diners club PIX SPEI OXXO PSE OZOW Platform-protected payments with refund support for eligible order issues.
Platform Logistics
Clearer shipment tracking with platform-supported logistics.
Inspection Service
Optional pre-shipment inspection for quality and quantity checks.
After-Sales & Dispute Handling
Platform-assisted dispute resolution, including refunds or returns when applicable.

Only orders placed and paid through Made-in-China.com Secured Trading are eligible for payment protection and the corresponding platform services.

Product Images of Scaffolding Jack Fixed Swivel Adjustable Galvanized Shoring Post Solid Steel Base Jack with Swivel Base Plate

Scaffolding Jack Fixed Swivel Adjustable Galvanized Shoring Post Solid Steel Base Jack with Swivel Base Plate
Scaffolding Jack Fixed Swivel Adjustable Galvanized Shoring Post Solid Steel Base Jack with Swivel Base Plate pictures & photos
Scaffolding Jack Fixed Swivel Adjustable Galvanized Shoring Post Solid Steel Base Jack with Swivel Base Plate
Scaffolding Jack Fixed Swivel Adjustable Galvanized Shoring Post Solid Steel Base Jack with Swivel Base Plate pictures & photos
Scaffolding Jack Fixed Swivel Adjustable Galvanized Shoring Post Solid Steel Base Jack with Swivel Base Plate
Scaffolding Jack Fixed Swivel Adjustable Galvanized Shoring Post Solid Steel Base Jack with Swivel Base Plate pictures & photos
Scaffolding Jack Fixed Swivel Adjustable Galvanized Shoring Post Solid Steel Base Jack with Swivel Base Plate
Scaffolding Jack Fixed Swivel Adjustable Galvanized Shoring Post Solid Steel Base Jack with Swivel Base Plate pictures & photos
Scaffolding Jack Fixed Swivel Adjustable Galvanized Shoring Post Solid Steel Base Jack with Swivel Base Plate
Scaffolding Jack Fixed Swivel Adjustable Galvanized Shoring Post Solid Steel Base Jack with Swivel Base Plate pictures & photos
Scaffolding Jack Fixed Swivel Adjustable Galvanized Shoring Post Solid Steel Base Jack with Swivel Base Plate
Scaffolding Jack Fixed Swivel Adjustable Galvanized Shoring Post Solid Steel Base Jack with Swivel Base Plate pictures & photos
Scaffolding Jack Fixed Swivel Adjustable Galvanized Shoring Post Solid Steel Base Jack with Swivel Base Plate
  • Scaffolding Jack Fixed Swivel Adjustable Galvanized Shoring Post Solid Steel Base Jack with Swivel Base Plate
  • Scaffolding Jack Fixed Swivel Adjustable Galvanized Shoring Post Solid Steel Base Jack with Swivel Base Plate
    Scaffolding Jack Fixed Swivel Adjustable Galvanized Shoring Post Solid Steel Base Jack with Swivel Base Plate
  • Scaffolding Jack Fixed Swivel Adjustable Galvanized Shoring Post Solid Steel Base Jack with Swivel Base Plate
    Scaffolding Jack Fixed Swivel Adjustable Galvanized Shoring Post Solid Steel Base Jack with Swivel Base Plate
  • Scaffolding Jack Fixed Swivel Adjustable Galvanized Shoring Post Solid Steel Base Jack with Swivel Base Plate
    Scaffolding Jack Fixed Swivel Adjustable Galvanized Shoring Post Solid Steel Base Jack with Swivel Base Plate
  • Scaffolding Jack Fixed Swivel Adjustable Galvanized Shoring Post Solid Steel Base Jack with Swivel Base Plate
    Scaffolding Jack Fixed Swivel Adjustable Galvanized Shoring Post Solid Steel Base Jack with Swivel Base Plate
  • Scaffolding Jack Fixed Swivel Adjustable Galvanized Shoring Post Solid Steel Base Jack with Swivel Base Plate
    Scaffolding Jack Fixed Swivel Adjustable Galvanized Shoring Post Solid Steel Base Jack with Swivel Base Plate
  • Scaffolding Jack Fixed Swivel Adjustable Galvanized Shoring Post Solid Steel Base Jack with Swivel Base Plate
    Scaffolding Jack Fixed Swivel Adjustable Galvanized Shoring Post Solid Steel Base Jack with Swivel Base Plate

Find Similar Products

Product Description

Construction Scaffolding Wing Nut Fixed Swivel Adjustable Solid Steel Base Jack with Swivel Base Plate

A scaffolding screw jack is an important accessory to provide support and end-to-end connection for construction work. It helps to level the scaffolding system to ensure safety.
With its high capacity and extremely durable rolled spindle thread, our Scaffolding Screw Jack has become a necessary component of scaffolding systems and is widely used by different area clients.

 
Product name HDG Scaffolding Accessory Adjustable Hollow Screw Jack Base U head
Material Carbon Steel
Plate Size 120*120*4mm, 150*150*5mm, 150*120*4mm
Size 34*4*400mm, 38*4*400mm, 48*4*600mm, 
Surface Treatment Galvanized Zinc, Hot Dip Galvanized, Painting
M.O.Q 100pcs
Packing pallet
Business Type Manufacturer
Certification ISO
Notes Special marks can be printed according to requirements
It is available to produce by customer drawing


Scaffolding Jack Fixed Swivel Adjustable Galvanized Shoring Post Solid Steel Base Jack with Swivel Base Plate

Product Parameters

 

A. Adjustable Base Jack
Pipe Plate
M30(Solid) x 600mm 120mm x 120mm x 4mm
M32(Solid) x 600mm 140mm x 140mm x 4mm
M34(Solid) x 600mm 150mm x 150mm x 6mm
38(Hollow) x 4 x 600mm 120mm x 120mm x 5mm
B. Adjustable Up U-Head Jack
Pipe U-Head
M30(Solid) x 600mm 120mm x 100mm x 45mm x 4mm
M32(Solid) x 600mm 150mm x 120mm x 50mm x 4.5mm
M34(Solid) x 600mm 150mm x 150mm x 50mm x 6mm
38(Hollow) x 4 x 600mm 120mm x 120mm x 30mm x 3mm
Scaffolding Jack Fixed Swivel Adjustable Galvanized Shoring Post Solid Steel Base Jack with Swivel Base Plate
Scaffolding Jack Fixed Swivel Adjustable Galvanized Shoring Post Solid Steel Base Jack with Swivel Base Plate
Features
♦ Material: Q235 round bar, ERW pipe.
♦ Diameter:30mm/32mm/34mm/38mm/48mm or as per your request.
♦ Hygeian and safe due to disposable use.
♦ Adjustable Length: from 100mm to 1000mm as ur request.
♦ Type: Solid / Hollow.
♦ Surface treatment: Galvanized.
♦ Main components: Threaded bar, cast nut, and base plate.
♦ Certificate: ISO 9001, SGS.
♦ Package: By Pallet suitable for sea transportation or as requested.
♦ OEM service available.
♦ Samples are available.

 

Detailed Photos

 

Scaffolding Jack Fixed Swivel Adjustable Galvanized Shoring Post Solid Steel Base Jack with Swivel Base Plate

Application

Application:

It can be used for all forms of access and support structures in the building and construction industries,
shipbuilding, off-shore construction, and industrial maintenance. Our scaffolding consists of galvanized
high-strength steel modular components that are assembled together using integral wedge connectors. 
Scaffolding Jack Fixed Swivel Adjustable Galvanized Shoring Post Solid Steel Base Jack with Swivel Base Plate

 Scaffolding Jack Fixed Swivel Adjustable Galvanized Shoring Post Solid Steel Base Jack with Swivel Base Plate

Our Advantages

Advantage

♦ Adjustable scaffolding jack
♦ For many types of scaffolding systems, such as ring lock systems, frame systems and clock systems.
♦ With or without stiffeners.
♦ Good joint, high loading capacity.
♦ Many types of plates.
Scaffolding Jack Fixed Swivel Adjustable Galvanized Shoring Post Solid Steel Base Jack with Swivel Base Plate

         Quality control:
         * We have specialized QC testers to check the quality of the products according to different customers
         requirement. Usually, it's a random inspection, and we also offer 100% inspection at a reasonable price
         if required.
         * We have IQC to check the dimensions and surface of the incoming material
         * We have PQC to inspect full-course during the manufacturing processing
         * We have FQC to inspect all the anodizing/plating and other finishes products from our supplier and
         proceed with the professional quality and appearance inspection before shipping.


 

Packaging & Shipping

Packing:
1. Generally, the total net weight of a loaded container is 22 tons to 26 tons, which needs to be confirmed before loading.

2. Different packages are used for different products: 
---bundles: timber beam, steel props, tie rod, etc.
---pallet: small parts will be put in bags and then on pallets.
---wooden cases: it is available on customer's request.
---bulk: some irregular goods will be loaded in bulk in the container.

Scaffolding Jack Fixed Swivel Adjustable Galvanized Shoring Post Solid Steel Base Jack with Swivel Base Plate
Delivery:
1. Production: For full container, normally we need 20-30 days after receiving the customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements. 
 

FAQ

 


     FAQ:

1. What are Scaffolding U-Head and Base Jack?
They are two essential height-adjustment accessories for scaffolding and shoring systems:

U-Head (Fork Head / Top Jack): Fits on top of a vertical scaffold tube (standard or prop). Its U-shaped saddle directly supports horizontal bearers (beams, timber, or metal beams) used for formwork or loads.

Base Jack (Sole Plate / Bottom Jack): Fits at the bottom of a vertical scaffold tube. Its base plate distributes the load onto the ground or supporting surface, and its screw allows for leveling on uneven surfaces.
Used together or separately, they provide fine adjustment, leveling, and stable load transfer.

2. What are their primary functions in a scaffolding system?
U-Head: Provides a secure, adjustable connection point between the vertical support and the horizontal load-bearing member. It allows for precise final height adjustment and easier striking (removal) of formwork.

Base Jack: Provides a stable, level foundation for the scaffold standard. It compensates for ground irregularities, ensuring the scaffold is plumb and the load is evenly distributed to prevent sinking or tilting.

3. What types do you manufacture?
We produce a full range of standard and heavy-duty models:

U-Heads: Standard U-Head, Swivel U-Head (rotates 360°), Heavy-Duty U-Head with thicker plates.

Base Jacks: Standard Base Jack, Square Base Plate Jack, Spigot Base Jack (for connecting two tubes).

Sizes: Compatible with standard 48.3mm OD (1-1/2 inch Nominal Bore) scaffold tube. Other sizes available upon request.

4. What materials and construction are used?
We use durable materials for strength and repeated use:

Body/Fork: Pressed/Stamped from Q235 Steel Plate (3mm-5mm thick) or Cast from Ductile Iron for high-duty models.

Adjustment Screw: High-Tensile Steel (Grade 8.8) with a coarse, rolled thread for strength and smooth operation.

Base Plate: Stamped Steel Plate, typically 150x150mm or 200x200mm.

Surface Treatment: Hot-Dip Galvanizing (HDG) is standard for superior corrosion resistance. Electro-galvanizing or paint is available.

5. How do I request a quote or sample?
For a fast quote, please specify:

Product Type (U-Head or Base Jack) and preferred size/load.

Quantity required.

Surface finish (HDG standard or other).

Any special requirements.


6. What is the height adjustment range?
U-Head & Base Jack: Both typically offer 500mm (20 inches) of total screw travel.

Adjustment: Achieved by rotating the large hand wheel or using a scaffold spanner on the nut. This allows for leveling and fine-tuning the height after the main tube is roughly set.

7. How are they installed and used?
Installation is simple but must be done correctly:

Base Jack: Screw the jack to the desired starting height. Place it on firm, level ground. Insert the scaffold tube into its socket.

Scaffold Erection: Build the scaffold to near-final height.

U-Head: Insert the U-Head onto the top of the scaffold tube. Place the horizontal bearer (timber/beam) into the U-shaped saddle.

Final Adjustment: Use the screw mechanisms on both the Base Jack and U-Head to make the final, precise adjustment to the required level and height.
Always ensure the screw has sufficient thread engagement (minimum 75%).

8. What are the advantages of using them?
Versatility & Precision: Allows for exact height adjustment to achieve level working platforms or formwork.

Stability & Safety: Base plate prevents sinking; secure connection prevents slippage.

Reusability & Durability: Galvanized steel withstands harsh site conditions.

Labor Efficiency: Speeds up setup and striking compared to non-adjustable systems.

9. Do you offer other scaffolding accessories?
Yes, we are a full-range scaffolding supplier. We also provide:

Scaffold Tubes (Standards, Ledgers)

Couplers (Swivel, Double, Sleeve)

Scaffold Boards (Planks)

Diagonal Braces

Complete system solutions.

10. Can you customize products (OEM)?
Absolutely. We offer OEM services including:

Custom base plate sizes.

Special thread lengths or diameters.

Private labeling and packaging.

Custom finishes (colors, coatings).

11. What is your MOQ (Minimum Order Quantity)?
Standard U-Heads/Base Jacks: MOQ 200 pieces per type.

Custom/OEM Orders: MOQ 500 pieces (negotiable).

Full Container Loads: Most cost-effective.

12. What is the production lead time?
Samples: 7-10 working days.

Standard Order: 15-25 working days.

Custom Order: 30-40 working days after confirmation.



Scaffolding Jack Fixed Swivel Adjustable Galvanized Shoring Post Solid Steel Base Jack with Swivel Base Plate
         If you are interested in our products, please send a message to us! 
      Quality First, Price Best, Service Foremost!
      We assure you of our best services at all times!

About the Supplier

This supplier has been audited by BV. Verify the report on the official BV website with ID "MIC-ASR2552083". Items marked "verified" are certified.

Watch Video
Watch Video
Weifang Jufeng Metal Products Co., Ltd.
Weifang Jufeng Metal Products Co., Ltd.
Weifang Jufeng Metal Products Co., Ltd.
Weifang Jufeng Metal Products Co., Ltd.
Weifang Jufeng Metal Products Co., Ltd.
Weifang Jufeng Metal Products Co., Ltd.
Weifang Jufeng Metal Products Co., Ltd.
Weifang Jufeng Metal Products Co., Ltd.

About Our Factory & Business Background

verified Business Type
Trading Company
Address
1002-1005 Room,Yunjingtai,Yuhe Road Shengli Street No. 4888, Kuiwen District, Weifang, Shandong, China
verified Plant Area
118 square meters
verified Number of Employees
5
verified Registered Capital
1,000,000 RMB
verified Terms of Payment
LC, T/T, D/P, PayPal, Western Union, Small-amount payment
verified International Commercial Terms(Incoterms)
EXW, CFR, CIF, FOB
verified Average Lead Time
Peak Season Lead Time: within 15 workdays, one month
Off Season Lead Time: within 15 workdays, one month
verified Nearest Port
Qingdao Port, Shanghai Port
verified Minimum Order Quantity
50 PCS
verified Supply Chain Partners
45

Our Production Capability & Technical Expertise

verified Main Products
Sheet Metal Stamping Parts, Sheet Metal Fabrication Parts, Metal Stamping Parts, Stamping, Metal Parts, Car Parts, Welding Parts, Punching Parts, Stamp Parts, Stamping Box
verified ODM Service Available
Yes
verified OEM Service Available
Yes
verified R&D Engineers
1 people

Our Industry Experience & Global Business Record

verified Year of Establishment
2017-01-03
verified Export Year
9 Years
verified Main Markets
South America, Europe, Southeast Asia/ Mideast
verified Number of Foreign Trading Staff
3
verified Overseas Agent/Branch
No

FAQ

What are Scaffolding U-Head and Base Jack?
They are two essential height-adjustment accessories for scaffolding and shoring systems. U-Head fits on top of a vertical tube to support horizontal bearers, while Base Jack fits at the bottom to distribute load and allow leveling on uneven surfaces.
What are their primary functions in a scaffolding system?
U-Head provides a secure, adjustable connection point for precise height adjustment and formwork removal. Base Jack provides a stable, level foundation that compensates for ground irregularities to prevent sinking or tilting.
What types do you manufacture?
We produce standard and heavy-duty models including Standard and Swivel U-Heads, Standard and Square Base Plate Jacks, and Spigot Base Jacks. Sizes are compatible with standard 48.3mm OD tubes, with other sizes available upon request.
What materials and construction are used?
Body and Fork are made from Q235 Steel Plate or Cast Ductile Iron. The Adjustment Screw is High-Tensile Steel (Grade 8.8). Base Plates are stamped steel (typically 150x150mm or 200x200mm). Surface treatment is standard Hot-Dip Galvanizing.
How do I request a quote or sample?
Please specify the Product Type (U-Head or Base Jack), preferred size/load, quantity required, surface finish (HDG or other), and any special requirements for a fast quote.
What is the height adjustment range?
Both U-Head and Base Jack typically offer 500mm (20 inches) of total screw travel, achieved by rotating the hand wheel or using a scaffold spanner.
How are they installed and used?
Install the Base Jack on firm ground, insert the tube, build the scaffold, then insert the U-Head on top. Place the bearer in the saddle and use screw mechanisms for final precise adjustment, ensuring minimum 75% thread engagement.
What are the advantages of using them?
They offer versatility and precision for exact height adjustment, stability and safety by preventing sinking, reusability due to galvanized steel durability, and labor efficiency by speeding up setup.
Do you offer other scaffolding accessories?
Yes, as a full-range supplier, we also provide Scaffold Tubes, Couplers (Swivel, Double, Sleeve), Scaffold Boards, Diagonal Braces, and complete system solutions.
Can you customize products (OEM)?
Absolutely. We offer OEM services including custom base plate sizes, special thread lengths or diameters, private labeling, packaging, and custom finishes like colors and coatings.
What is your MOQ (Minimum Order Quantity)?
Standard U-Heads/Base Jacks have an MOQ of 200 pieces per type. Custom/OEM orders have an MOQ of 500 pieces (negotiable). Full Container Loads are the most cost-effective option.
What is the production lead time?
Samples take 7-10 working days. Standard orders take 15-25 working days. Custom orders take 30-40 working days after confirmation.

Send your message to this supplier

Contact Information
Recipient
Message

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now