Customization: | Available |
---|---|
Material: | PP |
Application: | Electronics, Automotive, Agricultural |
Still deciding? Get samples of US$ 3/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Mold Material
|
Aluminum,45#, P20, H13, 718, 1.2344, 1.2738 and so on
|
Plastic Material
|
PC/ABS, ABS, PC, PVC, PA66, POM or other you want
|
silicon rubber Material
|
NR, NBR, SBR, EPDM, IIR, CR, SILICONE, etc
|
Plastic Surface finish
|
Polishing finish,Texture Finish,Glossy Finish,Painting,Slik print,Rubber Painting etc
|
Drawing format
|
IGES, STEP, AutoCAD, Solidworks, STL, PTC Creo, DWG, PDF, etc..
|
The Way of Color Contrast for Plastic
|
RAL PANTONE
|
Certificated
|
ISO 9001:2015 Certificated, SGS Certificated
|
Service Project
|
To provide production design, production and technical service, mould development and processing, product assembly and packaging,etc
|
Item | Description |
1.Mould material | P20,718H,45#,STAVAX ESR S136,H13,2316,2083,2344 |
2.Hardness of steel | vacuum quenching ,nitride,HRC41-47, HRC46-50,HRC60 |
3.Inserts / Slider steel | H13 (DIN.1.2344),tempered with HRC46-50 |
4.Mould spare parts | H13 (Din 1.2344),tempered with HRC40-45,nitrited with HRC60-62 |
5.Mould base | LKM,HASCO |
6.Mould cavity | Single / Multi |
7.Runner system | Hot / Cold |
8.CAD centre for data formats | IGES,X_T,STP & DWG,etc |
9.Plastic material | ABS,PC,PE,PP,PS. |
10.Mould life | 80000- more than 1000000 |
11.Delivery time | 4-8 weeks |
12.Terms of payment | T/T, Paypal, Western Union and so on |
1. Competitive price.
2. Strict quality control system.
3. Quick mold making and delivery.
4. Advanced equipment, excellent R&D teams.
5. Professional technicians and rich experienced workers.
1.Product Design,Structural Optimization,Process Optimization
2.Mold Making,Plastic Molding Parts,Casting Parts,Machining Part
3.Manage Project,Control The Delivery and Quality of Products
4.Arranging the Transportation,Customs Clearance and other Matters for You.
Shipping way:
1) 0-100kg: express&air freight priority,
2) >100kg: sea freight priority,
3) As per customized specifications
Packing & Delivery:
1.Packing Detail: Each product packed with plastic preservative, EPE, foam plastic bag, Carton outside, wood case
or iron case or as per the customer's special requirement. Besides,the custom package takes a week to
prepare in advance.
2.Delivery Detail: the fast International Shipping time takes 3 ~5 working days by DHL/UPS/FedEx, slow shipping
time takes 7~ 8 working days by DHL/UPS/FedEx/TNT, etc.
Q1. What's your main business?