|
Still deciding? Get samples of $ !
Order Sample
|
| Customization: | Available |
|---|---|
| Standard: | GB, EN, China GB Code, JIS Code, TEMA, ASME |
| Tolerance: | +/-0.02mm |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Specifications:

|
Item Name |
Sheet metal fabricating |
|
Material |
Aluminum,Carbon steel,Mild steel,Cold roll steel,Hot roll steel |
|
Thickness |
0.5mm-25mm |
|
Specification |
Customized |
|
High Precision |
+/-0.01mm |
|
Surface treatment |
Powder coating |
|
Manufacture |
Laser Cutting/Shearing/Punching/Bending/Welding/Coating/Others |
|
Drawing File |
2D:DWG,DXF,PDF |
|
Certificate |
ISO SGS |
sheet metal fabrication advantages:
FAQ:
Q: Are you trading company or manufacturer?
A: We are Factory, Mainly processing customized sheet metal products.
Q: How soon can I get your response?
A: our company rules that we must reply customers within 24 hours. Our current average response time is 4.3 hours.
Q: How soon can I get your quotation?
A: We are trying to quote you within 24 hours, however, it depends on drawings quantity and complicating rate. If you are really very urgent, call us or email us so that we will put it in priority.
Q: How can I get a sample for quality check?
A: After quotation, if needed, you can ask for samples to check quality. We will provide you free samples(value under 20 without tooling invest) as long as you pay freight cost by yourself.
Q: What's your leading time for mass production?cone sheet metal sheet metal fabrication
A: Laser cutting service, normally 1-3 days are needed.
Custom metal parts,normally 2-7 days are needed.
Equipment&Instrument Shell, normally 7-30 days are needed.
Integral Machine machining, normally 20-50 days are needed.
Of course, order quantity is an very important element for leading time.
Q: What is your terms of payment ?
A: Payment≤1000USD, 100% in advance. Payment≥1000USD, 30% T/T in advance, balance before shippment.
Q: What materials do you commonly work with?
A: We work with a wide range:
Steels: Cold/hot rolled (SPCC, Q235), galvanized (SGCC), stainless (304, 316).
Aluminum: 5052, 6061 (most common), 1100.
Other: Copper, brass, and some specialty alloys.
We can source the material or work with your supplied material (CSM).
Q: How do I choose the right surface finish?
A: The choice depends on environment, aesthetics, and budget:
Powder Coating: Most popular. Durable, many colors, good for indoor/outdoor.
Anodizing (Aluminum only): Excellent corrosion/abrasion resistance, conductive.
Plating (Zinc, Nickel): Good corrosion protection, decorative, often for hardware.
Brushed/Polished: Purely aesthetic, for decorative panels.
We can advise based on your application.
Q: Can you work with pre-finished material (e.g., pre-painted sheets)?
A: Yes, but with important notes. Forming (bending) will likely cause micro-cracking or damage to the finish on the outside of the bend. For the best cosmetic result, we strongly recommend post-fabrication finishing (painting/powder coating after all cutting and bending is complete).
Q: What information do you need for a quotation?
A: For a fast and accurate quote, please provide:
Drawings or 3D Files (as per Q2).
Material Specification (type, grade, thickness).
Quantity Required.
Surface Finish Requirements.
Any Special Standards or Certifications (e.g., ISO, RoHS).
Q: What is your Minimum Order Quantity (MOQ)?
A: We are flexible. For custom fabrication:
Typical production MOQ is 50 pieces to make setup efficient.
For very simple parts, MOQ may be 100-500 pieces.
Pricing per piece improves significantly with higher volumes.
Q: How do you charge for fabrication services?
A: Quotes are typically a fixed price per part, based on:
Material Cost (raw sheet stock).
Machine/Process Time (cutting, bending, welding hours).
Setup & Programming Time.
Cost of Secondary Operations (finishing, hardware).
Tooling (if custom punches/dies are needed).
We provide a transparent breakdown.
Q: What is your typical lead time?
A: Lead time depends on complexity and quantity:
Prototypes: 10-15 working days after order confirmation.
Small Batch (≤500 pcs): 15-25 working days.
Large Production Run: 25-40 working days.
Lead time starts after we receive final approved drawings and deposit.