|
Still deciding? Get samples of $ !
Order Sample
|
| Customization: | Available |
|---|---|
| Standard: | GB, EN, China GB Code, JIS Code, TEMA, ASME |
| Surface Treatment: | Electroplating |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Robot welding
A robotic TIG (Tungsten Inert Gas) welding center. A robotic MIG (Metal-arc Inert Gas) welding center. Combined with various special fixtures, we can process various complex parts. We can even use automatic welding technology inside the box.|
Name
|
custom sheet metal fabrication laser welded service welding parts
|
|
Material
|
Satinless steel,iron,aluminum,alloy,brass etc.
|
|
Tolerance
|
±0.1 mm
|
|
Size or shape
|
According to customer drawing or request
|
|
Application
|
Used Widely
|
|
Drawing accepted
|
All formats. Such as: cad, pdf, solidWorks,proE,ug,etc.
|
|
Machining
|
welding, bending, Laser cutting
|
|
Quality Control
|
ISO 9001,100% QC Test before shipment.
|
|
Surface treatment
|
Polishing, brushing, chrome,painting, powder coating,hot dip,spraying etc.
|
|
Delivery Time
|
7-30 days
|
|
Service mode
|
OEM or ODM, customized
|
|
Certificate
|
ISO 9001
|
|
Feature or advantage
|
R&D ability, FREE design, All in one solution.cost reduction.
|
Features:
Material Compatibility: Welding parts are designed to work with specific materials like stainless steel, carbon steel, aluminum, etc., ensuring a high-quality bond.
Corrosion Resistance: Many welding parts are made from corrosion-resistant materials to extend the lifespan of the welded joints, particularly in harsh environments.
Customizability: Welding parts can be customized in terms of size, shape, and thickness to meet specific project requirements.
Heat Resistance: Certain welding parts are designed to withstand extreme temperatures, which is crucial in high-temperature applications such as power plants or engine components.
Durability: Welded joints created with high-quality welding parts are often more durable than other types of joints, ensuring the longevity of the final product.
Common welding processes used to assemble these parts include:
Arc Welding (SMAW): Using an electric arc between an electrode and the base material.
MIG Welding (GMAW): Using a continuous solid wire electrode fed through a welding gun.
TIG Welding (GTAW): Using a non-consumable tungsten electrode to produce the weld.
Resistance Welding: Using heat generated by electrical resistance to join sheets of metal.


Advantages:

| A. Raw Material | Copper ,BeCu, phosphor copper, Brass, Stainless steel, Aluminum, SGCC, SECC, steel, spring steel, Nickel-Silver... and all different kinds of metal; |
| B. SPEC | Roll material thickness is 0.05-10mm;sheet metal thickness is 0.3-20mm; |
| C. Surface treatment | Gold / Silver /Tin / Nickel / Zinc / Chromium / Copper-plating / Laser etching/Screen printing/Phosphating (can pass salt spray testing with 160 hours)/Black coating / Painting/ Power coating /Electrophoresis / Passivating /Deburring / Polishing / Brush according to ROHS standard; |
| D. Application | All different kinds of telecom products, loom, furniture, and so on ; |
| E. Quotation | Please provide the Formal drawings (normally, with DWG/STP/PDF file ),and make note with material/QTY/surface treatment and any other requirements, we will provide you the quotation sheet in 48-72 hours; |
| F. Prototype & Mould | We make the prototypes or moulds according to the drawings that confirmed by both of us and customers! The lead time is depends on the structure and qty of parts, Normally, lead time for prototypes is 3-15 days; lead time for mould is 10-25 days; |
| G. Production | We will provide samples according to the drawings to customers for approval. Then arrange the production and confirm the delivery date according to the Purchase Order; Normally , the lead time for production is 5-30 days ,the structure of parts is different , the lead time will be different . |
| H. Package | Plastic bags; Preserving Box; Reel/tape package; Plastic tray; Wood box; Export carton and any other customized package according to the customers' requests. |
